Every constraint the scheduler must respect: machine maintenance, operator skills and leave, material readiness, and external-provider turnaround windows.

Machines

Grouped by work centre. Maintenance windows are hard downtime.
Work centreMachineMaintenance windows
Cutting
LC-01
Laser Cutter LC-01
None scheduled
Welding
WB-01
Welding Bay WB-01
None scheduled
WB-02
Welding Bay WB-02
None scheduled
CNC Machining
CNC-02
CNC Mill CNC-02
None scheduled
CNC-03
CNC Mill CNC-03
  • Thu 06 Aug · 07:00Thu 06 Aug · 12:00
Painting
PB-01
Paint Booth PB-01
  • Mon 03 Aug · 07:00Fri 07 Aug · 16:00
Inspection
INSP-01
Inspection Bench INSP-01
None scheduled
Packing
PACK-01
Packing Station PACK-01
None scheduled

Operators

Skill set, assigned shift, and any leave that blocks scheduling.
OperatorSkillsShiftLeave
Lim Wei Kiat
op-lim
cnc
Day
07:00–15:30
Mon Tue Wed Thu Fri Sat
  • Wed 05 Aug
Tan Boon Hock
op-tan
cuttingwelding
Day
07:00–15:30
Mon Tue Wed Thu Fri Sat
None
Siti Rahman
op-siti
weldinginspection
Day
07:00–15:30
Mon Tue Wed Thu Fri Sat
None
Rajesh Kumar
op-raj
cuttingwelding
Evening
15:30–23:00
Mon Tue Wed Thu Fri Sat
None
Mei Ling Chua
op-mei
paintinginspection
Day
07:00–15:30
Mon Tue Wed Thu Fri Sat
None
Farid Ismail
op-farid
weldingpacking
Evening
15:30–23:00
Mon Tue Wed Thu Fri Sat
None
Joseline Ong
op-jos
inspectionpacking
Day
07:00–15:30
Mon Tue Wed Thu Fri Sat
None
Hafiz Rahim
op-hafiz
cuttingpaintingpacking
Evening
15:30–23:00
Mon Tue Wed Thu Fri Sat
None

Materials

A first operation cannot start before its material is ready.
MaterialStatusAvailable from
Mild steel plate 10mm
mat-ms-plate
ReadyOn hand
Aluminium billet 6061
mat-al-billet
ReadyOn hand
Aluminium billet 6061 (SO-1002 batch)
mat-al-billet-1002
ArrivingWed 05 Aug · 07:00
Stainless tube 304
mat-ss-tube
ReadyOn hand
Fastener kit assorted
mat-fasteners
ReadyOn hand
Marine-grade paint
mat-paint
ReadyOn hand
Stainless sheet 316L batch
mat-ss316l
ArrivingWed 05 Aug · 12:00

External providers

Off-site work centres with transport and turnaround assumptions.
ProviderOff-site nodeTiming assumptions
HeatTreat Partners
wc-heattreat
HTP-EXT
Transport out4h
Turnaround48h
Transport back4h
Receiving inspection2h
Total off-site window: 58h